2008 Projects
Over 70 people attended the 2008 SWC Spring Meeting at the DoubleTree Hotel, Washington DC on April 24-25, 2008. The meeting focused on reviewing funding requests from twenty proposals requesting over $3.9M. Rep. John Peterson (PA) opened the meeting followed by a technology panel from past projects.
The Executive Council met immediately following the close of the general meeting to consider all proposals. Eight proposals were recommended for co-funding totaling over $842,000.
For the complete listing of projects in one document, click here.
- Electrochemistry, an Economical Solution for the Treatment and Purification of Produced Waters
Greensburg Oil
- Two-Phase Flow Impairment in Gas Gathering Systems: Problems, Detection and Solutions for Stripper Well Systems
The Pennsylvania State University
- Field Demonstration of a New Low Cost Hydraulically Operated Insertable Pump for Stripper Wells
Salt River Engineering
- A Optimizing Stripper Well Production with JLS Gas Drive Fluid Lifting System
Jet Lifting Systems
- Solar Powered Pump Jack for Stripper Wells
R&A Moore, Inc.
- Can a Simple Control Make More Oil?
Oil Well Sentry
- Demonstration of Directed Slotting-Fracturing Technology
Hydroslotter Corp.
- Validation of Incremental Oil Productions via Single Well and Reservoir Field Trials Involving in situ Stimulation of Indigenous Microorganisms
RAM Biochemicals

