2005 Projects
For the complete listing of projects in one document, click here.
- Re-Fit Two Stripper Wells with Existing Large Diameter or Open Hole Completions with Spoolable Non-Metallic Tubing, Transition Connections, Variable Diameter Seal Cups and Modified G.O.A.L. Casing Swab to Automatically Lift Fluids and Enhance Performance
Brandywine Energy and Development Company, Inc.
- New Technology for Unloading Gas Wells
Colorado School of Mines
- Demonstration of Hydroslotter Technology on New York Stripper Wells
Hydroslotter Corporation
- Extended Application of a Proven Low Cost Water Mitigation Treatment
IMPACT Technologies, LLC
- A Study to Evaluate the Effect of Completion and Production Procedures on the Ultimate Recoverable Reserves from Knox Formation Wells: Rose Run Sandstone and Beekmantown Dolomite
James Engineering, Inc
- Field Application of Accurate, Low-Cost, Portable Production Well Testers
Oak Resources, Inc.
- Evaluating Casing Plunger Cup Design
PAAL, LLC
- Interaction of Nitrogen/CO2 Mixtures with Crude Oil
The Pennsylvania State University
- Uncovering Bypassed Pay in Central Oklahoma Using Statistical Analysis and Field Tests
Schlumberger Consulting Services
- Desalination of Brackish Water and Disposal into Waterflood Injection Wells
Texas A&M University
- Real Time Remote Field Monitoring of Plunger Lift Wells to Reduce Production Down Time and Increase Natural Gas Production
Tubel Technologies, Inc
- Control of Water Production Using Disproportionate Permeability Reduction in Gelled Polymer Systems
University of Kansas
- Building and Testing a New Type of Vacuum Pump for Casinghead Pressure Reduction in Stripper Wells
W & W Vacuum & Compressors, Inc

